Past Press Releases

 


LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN (LEED)
Protecting the Environment- Construction 2007

"Baybutt Construction Coporation completed a LEED certified project at the Barre Family Health Center, Barre MA for UMASS Memorial. This project is very special because hospital design typically requires the facility to be operated in a manner that interior air quality conditions be as high-quality as possible.  The LEED program, on the other hand, emphasizes energy savings through reduced operating time of HVAC equipment and Mechanical systems. Through careful attention to detail, planning, and review with all parties involved; the project was able to be built in a manner that is energy efficient as well as meet stringent hospital operating standards.

Baybutt Construction Corporation was very involved throughout the entire construction process in various aspects."



SPRINGFIELD ELEMENTARY SCHOOLS UNDER CONSTRUCTION


"After several years of planning, and after funding was approved by the taxpayers, the Union Street and Elm Hill Elementary Schools in Springfield VT will now get their needed renovations and additions . Baybutt Construction Corp. of Keene was the successful low and responsible bidder on these two school projects, coming in at $16.23 Million. Dore and Whittier Architects of Burlington VT are the designers for these projects. Elm Hill students have b en relocated while the $6,757,725 construction occurs, which will include extensive site work, threee additions and comprehensive renovation to existing school. Union Street students will occupy the school during the $9,475,525 addition and renovation project which will include site work, comprehensive renovation to existing school and a 15,000 sf addition."


Baybutt Construction Building New Police Headquarters


" Baybutt Construction was awarded the construction management contract to build the new Police Headquarters for the City of Somersworth, NH. After the City Council gave final approval of the project budget, Baybutt broke ground in April. The project, designed by Goudreau & Associates Architects, PLLC, includes new construction of a 13,000 sf police facility and comprehensive site improvements to include an impound area. The headquarters will be a two-story building with brick façade, will contain two cells and a holding area, booking area, interview room, dispatch, armory, two state-of-the-art sally ports, evidence storage and processing, surveillance and security system, an emergency generator, and will house the City’s Emergency Operations Center. The project, valued at $3,048,100, is scheduled to be completed in early 2008. "


Baybutt Construction Building Needed Housing In Brattleboro, VT
April 16, 2007


" Baybutt Construction is currently renovating two landmark buildings in Brattleboro- the Basketville Warehouse on Birge Street and the Worden House on Western Avenue- to address the local need for housing. When completed, these two buildings, owned by the Brattleboro Area Community Land Trust, will provide apartments, single room occupancies and office space. Baybutt Construction is working with architects Williams & Frehsee of Brattleboro on this $4.8 Million project. Completion is scheduled for January 2008. "


Local Firms Collaborate to Achieve Award Winning Project
Bellows Falls Waypoint Interpretive Center- Bellows Falls, VT
January 25, 2006



" Under the lead and dedication of Daniel V. Scully Architects of Keene NH, collaborating with Clough Harbor & Associates, LLP and Baybutt Construction Corporation, an architectural award-winning project is now situated in Bellows Falls VT near the Connecticut River. Visually, the building appears as a train station, platform with canopy. The Bellows Falls Waypoint Interpretive Center includes display and meeting room areas, and resembles a wooden railroad station. Bisecting the platform is a concrete sidewalk with steel arch above, replicating the old Arch Bridge which spanned between NH and VT, and was demolished in 1982. The crossing axis of the bridge and train create the “Square” –the brick patio which fulfills the platform imagery. This outstanding project puts the present in context with the past, and is worthy of its visitors. "


Baybutt Construction Managing Construction of another US Post Office and much needed Housing on Nantucket Island in Massachusetts
January 9, 2006



"The new construction of the 7500 sf US Post Office involves significant sitework including relocation of town’s utilities before building construction can commence. In addition to the new state-of-the-art secure US Post Office, two much needed duplex housing units will be constructed on site as well. Total project is valued at $4 million, and the Architects for the project are Ingram Architects out of Nantucket and Boston MA, and D. Neil Parent Associates of Nantucket."


Nobadeer Meeting House-Nantucket, MA
May 11, 2003


"Baybutt Construction Breaks Ground On $20 Million Major Residential Development On Nantucket Island, MA.

Baybutt Construction Corporation, serving as construction manager, has broken ground on a $20 million 48-unit major residential development (MRD) called Nobadeer Meeting House on Nantucket Island in Massachusetts.

As Construction Manager of this Design/Build MRD, Baybutt is overseeing all permitting and construction including all of the site development of this 3-acre parcel. The project is designed as a Village Concept including a central triangular green and swimming pool for gathering outdoors and a central meeting house for indoor gatherings.

Each unit consists of approximately 2000 square-feet of living space. Some of the units are 3 stories while some are 2 stories, each with a full basement. The total project square footage is approximately 100,000 square-feet.

On an island where the housing supply is extremely tight these units will be priced for mid-income owners and nearly all have been sold prior to construction."

Westminster Center School-Westminster,VT/
Milford Elementary School-Milford, NH
November 11, 2005

"Baybutt Construction Building Expansions to Two Elementary Schools.


Westminster Center School in Westminster, VT has been under construction since July, when Baybutt Construction of Keene started the $2.5 Million addition/renovation.


This project includes renovations to the existing school to create new classrooms, and upgrade the kitchen to full-service.  The 12,000 square feet of new construction includes a new gymnasium, a new oil boiler and a wood chip boiler. 


Banwell Architects of Montpelier VT is architect for this project, which is scheduled to be completed in April 2006.


Students and staff at New Hampshire’s Milford Elementary School at Heron Pond will have more room to learn, come May of 2006.   Baybutt Construction started this $2.5 Million school project in September. 


This 19,000 sf project includes a two-story addition with offices, conference room, work rooms, custodial rooms, bathrooms and ten classrooms.  Also included is the addition of a new media center to the existing library. 


Architect for this project is Frank Marinace of New Hampton, NH. Baybutt Construction was the low and responsible bidder on both of these public school projects."

 

 

home | types of work | services
safety | projects | did yo
u know?

Visit the USGBC website Visit the AGC website Visit the AGC websiteHome

Baybutt Construction Corporation
25 Avon Street, Post Office Box 463
Keene, New Hampshire 03431 USA

Phone: 603.352.6846
Fax: 603.352.6633
Bid Fax: 603.352.6663
email: info@baybutt.com

 

site design by sykes associates, keene, nh 03431